East Perth

The Haig Park precinct of the East Perth redevelopment area forms a critical mixed use neighbourhood connecting the Claisebrook Inlet through major level changes up to the heritage cemetery on its southern boundary.

EPCΛD designed the public realm for this award winning project delivering a series of streets, back lanes and linear public spaces that have enabled this higher density river side community to establish successfully. The major spine of a narrow series of linked spaces provide a community focus of intimate spaces that spans extensive level changes.

The links through to the waterside are simple broad steps between buildings. As well as the public realm EPCΛD was commissioned by individual developers of residential units, commercial uses and the Chinese Consulate that now are integral elements of this vibrant community.

  • Sketch design, full documentation, contract administration
  • Extensive network of linear urban spaces
  • Public art integration
  • Streetscapes
  • Unifying property wall detailing
  • River front connections
sabung ayam online
akun pro thailand
Akun Pro Thailand
akun pro thailand
akun pro thailand
https://rajin-membaca.enamelpinfactory.com
Akun Pro Slot ovo
Mahjong Ways
sabung ayam online
Rajawalitoto Link Alternatif
Rajawalitoto
https://linkalternatif-denistoto.sabra.com/
https://daftar-sv388-gudangbet88.electriccalifornia.com/
https://link-alternatif-bima88.wattbike.com/
https://link-alternatif-anakslot.morrisonhotelgallery.com/products/anakslot-situs-slot-thailand
anakslot
ombak126
sabung ayam online
slot deposit pulsa 5000
slot deposit pulsa 5000